Economical and technical viability of demand response in the spanish power system: the "optiges" project
No Thumbnail Available
Identifiers
Publication date
2008
Advisors
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
This paper presents a project that is being carried out by Endesa in Spain with the aim of controlling peak demand by modifying the consumption of customers within the small and medium enterprise sector. A full load control architecture is being developed and different pilot tests are being specified.
Description
Type
Citation
Cobelo , I , Rodriguez , J E , Boyra , M , Anduaga , J & Castellanos , A 2008 , Economical and technical viability of demand response in the spanish power system : the "optiges" project . in CIRED seminar 2008 : SmartGrids for distribution . 12380 edn , IET Seminar Digest , no. 12380 , vol. 2008 , CIRED Seminar 2008: SmartGrids for Distribution , Frankfurt , Germany , 23/06/08 . https://doi.org/10.1049/ic:20080453
conference
conference