SmartNet: H2020 project analysing TSO–DSO interaction to enable ancillary services provision from distribution networks

Loading...
Thumbnail Image
Identifiers
Publication date
2017-10
Advisors
Journal Title
Journal ISSN
Volume Title
Publisher
Institution of Engineering and Technology
Citations
Google Scholar
Export
Research Projects
Organizational Units
Journal Issue
Abstract
This study presents an overview of the results obtained during the first year of the SmartNet project, which aims at comparing possible architectures for optimised interaction between transmission system operator (TSOs) and distribution system operator (DSOs), including exchange of information for monitoring as well as acquisition of ancillary services (reserve and balancing, voltage regulation, congestion management), both for local needs and for the entire power system. The results concerning TSO-DSO coordination schemes, market design and information and communication technology (ICT) architectures are shown along with the layout of the three technological pilot projects.
Description
Code 136196
Citation
Migliavacca, Gianluigi, Marco Rossi, Daan Six, Mario Džamarija, Seppo Horsmanheimo, Carlos Madina, Ivana Kockar, and Juan Miguel Morales. “SmartNet: H2020 Project Analysing TSO–DSO Interaction to Enable Ancillary Services Provision from Distribution Networks” CIRED - Open Access Proceedings Journal 2017, no. 1 (October 1, 2017): 1998–2002. doi:10.1049/oap-cired.2017.0104.