Show simple item record

dc.contributor.authorRubio-Miguel, D.
dc.contributor.authorMerino, Julia
dc.contributor.authorEguia-Lopez, P.
dc.contributor.authorTorres-Iglesias, E.
dc.date.accessioned2021-01-18T14:45:40Z
dc.date.available2021-01-18T14:45:40Z
dc.date.issued2020
dc.identifier.urihttp://hdl.handle.net/11556/1055
dc.description.abstractThis paper shows the results of the studies carried out to determine which system, batteries installed behind the meter (BTM) or batteries installed in front of the meter (FTM), shows the best performance in terms of minimal power losses and energy storage capacity that would have the Battery Energy Storage Systems (BESS) to be installed. The analysis has been carried out over real networks in the region of Murcia (Spain) with different topologies and a variable number and location of customers along the grid. In addition, real consumption profiles of random customers, as well as real measurements of the transformer loading curves recorded at the Secondary Substation (SS), have been considered in the analysis. In this way, it can be ensured that the results represent real situations that can be found nowadays.en
dc.language.isoengen
dc.publisherCIGREen
dc.titleAssessment of distribution grid losses depending on storage location for residential PV systems in three grids in the region of Murciaen
dc.typeconference outputen
dc.rights.accessRightsembargoed accessen
dc.subject.keywordsLossesen
dc.subject.keywordsBattery Energy Storage Systemsen
dc.subject.keywordsBehind The Meteren
dc.subject.keywordsIn Front of The Meteren
dc.subject.keywordsNetwork Simulationsen
dc.issue.numberC6-111en
dc.conference.title2020 CIGRE SESSIONen


Files in this item

FilesSizeFormatView

There are no files associated with this item.

    Show simple item record